抽水蓄能电站建设过程中的低碳施工技术与运营期碳减排路径分析
关键词:抽水蓄能电站;低碳施工技术;运营期碳减排;全生命周期管理中图分类号:X322 文献标识码:A 文章编号:1008-9500(2025)11-0225-03DOI:10.3969/j.issn.1008-9500.2025.11.070
Analysis of Low-Carbon Construction Technologies During the Construction Process and Carbon Emission Reduction Pathways During the Operation Period of Pumped Storage Hydropower Stations
YU Qinsheng (Sinohydro Bureau 6 Co., Ltd., Shenyang 118000, China)
Abstract: In response to the low-carbon transformation of pumped storage power station construction and operation, the innovative practices of low-carbon construction technologyduring theconstruction period have been systematically reviewed,including mchaizedonstruction,aplicationofintellgentmoitoringssems,cologicalrestorationpojects, etc.At the same time,an in-depth analysis was conducted on the carbon reduction path during the operation period, including the optimization of core functions such as peak shaving and valley filing,renewable energy consumption,and black start.Throughcase studies,thecollborative mechanismofcarbonreductionthroughout theentirelifecycleof pumped storage power stations has been revealed,providing theoreticalsupportand practical reference fortheconstructionof new power systems.
Keywords: pumped storage hydropower station; low-carbon construction technology;carbon emission reduction during the operation period; whole lifecycle management
在“双碳”目标驱动下,我国能源结构加速向清洁低碳转型。(剩余4064字)