复杂市政工程下穿高速铁路风险分析

打开文本图片集
中图分类号:U211;TQ178 文献标志码:A
文章编号:1001-5922(2025)10-0211-04
Risk analysis of complex municipal engineering underpassing high-speed railway
WU Hua1, JIAO Changbin² (1.EPC Design Institute of China Construction Fourth Engineering Division Co.,Ltd.,Guangzhou ,China; 2. Beijing Oriental Yuhong Waterproof Technology Co.,Ltd.,Beijing ,Chia)
Abstract: Taking the municipal engineering of Lucheng Road underpassing 350km/h high-speed railway project ina cityas an example,the risk assessment standard of municipal engineering underpasing high-speed railway is studied.Through the numerical simulationoffinite element analysis software PLAXIS,thesettlement deformation of pier top,longitudinal horizontaldeformationof pier top,transversehorizontal deformationof pier topandaxial force of pile foundation of high-speed railway during the construction of complex municipal engineering are analyzed.The construction and operation risks of Lucheng Road municipal engineering are evaluated,which provides a reference for similar projects to safely cross high-speed railway.
KeyWords:municipal engineering;high-speed railway;underpass engineering;numerical simulation;risk assessment
高铁铁路对线路平顺性要求高,邻近高速铁路施工会导致附近地层受到扰动,高速铁路结构随之发生移动和变形,进而引起高速铁路结构产生变化,如果不能正确评估施工对高速铁路带来的潜在危险,则可能发生难以估计的灾难性后果[1-4]。(剩余4675字)