污水处理工程施工设备安装与调试技术研究

  • 打印
  • 收藏
收藏成功


打开文本图片集

中图分类号:X703 文献标识码:A 文章编号:1008-9500(2025)07-0234-03

DOI: 10.3969/j.issn.1008-9500.2025.07.068

Research on Installation and Debugging Technology of Construction Equipment for Sewage Treatment Engineering

GUO Jiang (Guizhou Water Operation Co.,Ltd.,Guiyang550ooo, China)

Abstract:The basic principles of equipment selection,technical solutions for installationprocesses,keytechnical requirements for instalation processesare discussed in detail,and the equipment debugging steps and performance debugging methodsareanalyzed.Research has shown thattheyare all keytoensuring thesmooth operationof sewage treatmentprojects,and systematic technicalanalysiscan improvetheconstructioneficiencyofsewage treatment projects and ensure operational stability.

Keywords: sewage treatment; construction equipment; installation; debugging

随着社会的发展和工业化水平的不断提高,污水排放量和污染物种类的多样化使得污水处理系统的设计与建设面临前所未有的挑战。(剩余4316字)

目录
monitor