高温气冷堆氮气截止阀在线研磨维修方法研究

  • 打印
  • 收藏
收藏成功


打开文本图片集

中图分类号:TH138.5 文献标志码:A 文章编号:1671-5276(2025)03-0019-04

Research on Method of On-line Grinding and Maintenance for Helium Gas Isolation Valve in High Temperature Gas Cooled Reactor

DONGDailin1,WUXiao²,WUYiming³,FENGWei1,HUYuzhou1 (1.Key LaboratoryofNuclear Reactor System Design Technology,China Nuclear Power ResearchandDesign EngneeringCo., Ltd.,Chengdu 610041,China;2.Huaneng NuclearEnergy TechnologyResearch InstituteCo,Ltd.,Shanghai 2O0126,China; 3.Huaneng Shandong Shidaowan Nuclear Power Co.,Ltd.,Rongcheng,2643Oo,China) Abstract:Heliumgasisolationvalveusedinhigh temperature gascooledreactorinnuclear powerplantisaplied toopenand shut theheliuminthereactorcircuit,anditssealingperformanceplaysacrucialroleinthesafeoperationofthereactor.Tocope with thedecreaseofthesealingperformanceofheliumgasisolationvalveandthefailureofthevalvedisassmblingfromthesystem,an on-linegrinding maintenanceequipmentisdesigned basedonthesealingsurfaceof heliumgasisolationvalve.Thesealing performancetestverifiesthefeasibilityandefectivenessofon-linegrinding maintenanceoftheheliumgasisolationvalvesiulant. Keywords:nuclear power;high temperature gas cooled reactor;isolation valve;on-line grinding;maintenance

0 引言

高温气冷堆作为第4代反应堆,其安全性较第3代反应堆有着较大的提高。(剩余4340字)

目录
monitor