天然气高压管道水土保持措施设计
——以潮州市天然气高压管道项目(一期)为例

打开文本图片集
中图分类号:X171.4 文献标志码:A 文章编号:2095-2945(2025)28-0111-04
Abstract:Thispaperanalyzes thewaterandsoilconservationchange planof theChaozhou City High-Pressure Natural Gas PipelineProject(PhaseI),conductsin-depthresearchontheoverallayoutof preventionandcontrolmeasures,thetypical designofthenewmeasuresinthechangeplan,andthepreventionandcontrolefectaftertheimplementationof thewaterand soilconservationchangeplan,summarizestheexperienceofwaterandsoilerosionprevention,andprovidesreferencforthe designofsoiland waterconservation measuresystems forothernaturalgaspipelineprojectssimilarto Guangdong mountainous and hilly areas.
Keywords:naturalgaspipeline;mountainousandhillarea;constructionworkzone;soilandwaterconservationmeasure design; prevention and control benefits
天然气高压管道在山地丘陵区直埋时扰动面积大,影响面广,施工期间将破坏管道沿线作业带内地表植被,造成地表裸露,加速水土流失,破坏生态环境。(剩余5266字)