深基坑开挖立柱变形规律研究

  • 打印
  • 收藏
收藏成功


打开文本图片集

DOI:10.19981/j.CN23-1581/G3.2025.31.022

中图分类号:TU433 文献标志码:A 文章编号:2095-2945(2025)31-0096-04

Abstract:Taking Shaoxing TODdeep foundation pitastheexemplar,this paperstudiesthechange lawsofcolum piles duringfoundationpitexcavationThemainconclusionsareasfolows,withtheincreaseofexcavationdepth,thecolumnsatthe edgeofthe foundation pit gradualyshowrebound,with theupper limit of the maximum reboundamount being 0.096%H ,and the average maximum rebound amount being 0.038%H ;the center column of the foundation pit gradually shows settlement,with the upper limit of the maximum rebound amount being 0.053%H ,and the average maximum rebound amount being 0.037%H

Keywords: deep foundation pit; column; rebound; settlement; geological conditions

随着城市经济快速发展,基坑工程建设面临着越来越多的新要求,深基坑朝着“深”“大"等方向发展,对周围环境造成较大的影响,因此确保基坑工程的安全施工十分重要。(剩余3510字)