粉砂软土区拦挡坝基础微型钢管桩施工与滑坡泥流治理研究

  • 打印
  • 收藏
收藏成功


打开文本图片集

中图分类号:U416 文献标志码:A 文章编号:2095-2945(2025)31-0071-05

Abstract: On December 18, 2023,an Ms6.2 -magnitude earthquake occurred in Jishishan, Gansu Province, causing a mudflow secondarydisasterinnearbyZhongchuan Township,QinghaiProvince.Thegeologyofthisareaisdominatedbysiltandsoftsoil. Itshighwatercontent,highvoidratioandothercharacteristicsposegreatchalengestomudflowmanagementanddam construction.Traditionalfoundationtreatmentmethodsarenotefective.Thispaperaimstostudytheconstructiontechnologyof microsteelpipepilesinsiltsandandsoftsoilareasanditscontrolefectonlandslidesandmudflows,andprovidereferecefor geologicaldisasterpreventionandsimilarprojectsinthisarea.Usingmethodssuchascalculationanalysis,onsiteconstructionand processtest,thefoundationdesignandstabilitycalculationofthedamarecariedoutthroughtheanalysisofthereinforcement principleofmicrosteelpipepiles;theonsiteonstructionprocessofmicro-steelpipepilereinforcementiselaboratedindetail, andthe pileloadtestiscarriedout.Theresultsshowthatafterthemicro-steelpipepilesareformedbyusinghigh-presure circulatinggroutingtechnology,thefoundationbearingcapacityandsoilshearstrengthcanbeefectivelyimprovedAfterthe compositemicro-steelpipepilesareformed,thebearingcapacityofthesinglepileisnotlessthan140kN,which hasa treatmentefectotesurroundingsoftsoil,canavoidunevensettlementofthefoundation,andhasgoodaplicationrsultsin retainingdam foundation constructioninsilt-sandandsoft soil areas andthemanagementof landslidesand mud flow.

Keywords:siltsandsoft soil;microsteel pipepile;foundationreinforcement;retainingdam;landslide;mudflowcontrol

2023年12月18日,甘肃积石山发生 MS6.2 级地震,此次地震造成了大量的人员伤亡和财产损失。(剩余6399字)

目录
monitor
客服机器人