固化钻渣路基分层填筑变形规律研究

  • 打印
  • 收藏
收藏成功


打开文本图片集

中图分类号:U414 文献标志码:A 文章编号:2095-2945(2025)25-0098-05

DOI:10.19981/j.CN23-1581/G3.2025.25.022

Abstract:Useimproveddrllingmuck wastewithhighmoisturecontenttoreplacesubgradefilerstorealizetherecyclingof highwaysolid waste resources.Thedriling slag soil subgrade of a certain highway was filled byadding 4% CPJN-1 powder curingagent.Whenthesubgradeandpavementconstructioniscompleted,themaximumsetlementsoftheoriginaldrllingslag and the cured drilling slag at the center of the road are 90.90mm and 73.46mm respectively,which are similarto the calculationresultsofthelayeredsummationmethod.Themaximumsettlementofthecureddrillingslagsoilis19.19 % lower thanthatoftheoriginaldrllingslagsoilwhenthesubgradeiscompleted.Thesugradefillngconstructionwiththeimproved drillng slagcanefectivelyreducethehorizontaldeformationofthesubgradestructureandthesetlementdeformationofthe originalgroundsuface,reducetheuseoftraditionalcementmaterialssuchaslimeandcement,andalsohavegoodstability during the road operation period.

Keywords:utilizationof drillingresidue;curing agent;subgrade filling;numericalsimulation;layeredsettlement

随着“碳达峰、碳中和”战略的不断推进,固废资源利用迎来新一轮建设高峰期[1-2]。(剩余4314字)

目录
monitor
客服机器人