基于BIM技术的码头桩基施工工艺与进度管理分析

  • 打印
  • 收藏
收藏成功


打开文本图片集

中图分类号:U655.4 文献标志码:A 文章编号:2095-2945(2025)20-0193-04

Abstract:BIM(Building Information Modeling)modelshavewideapplicationprospectsandsignificantadvantagesinport engineringterminalconstructionschedulemanagement.ThroughspecificmodelingandanalysisofBMtechnologyreal-ime controliscarredoutfortheentirelifecycleofportconstructionprojectstoimprovetheoverallefcienyandqualityofport terminalconstruction.Byanalyzingthesimulatedpilingtechnologyforportterminalprojets,therationalityandaccuracyofthe pilingsequenceareensured.Byprovidingreal-timeconstructiondataandinformationto'helpconstructionpersonneladjust constructionplansinatimelymanner,itwillhelppromote thesustainabledevelopmentof portandterminalconstruction.

Keywords:BIM technology;BIMmodeling;port enginering;construction management;terminal pile foundation力。(剩余5466字)