黄土地区高速公路路基沉陷问题及治理施工技术

  • 打印
  • 收藏
收藏成功


打开文本图片集

中图分类号:U418.5 文献标志码:A 文章编号:2095-2945(2025)18-0185-04

Abstract:Themainpurposeof thisresearchistodeeplyanalyzethesetlementproblemsof expressaysubgradeinloes areasandtheircontrol strategies,especiallytheaplicationofdynamiccompactioninsuchproblems.Theresearchcontentcovers adetailedanalysisofthegeologicalstructure,hydrogeologicalconditions,anddesignandonstructionfactorsinthelosaea aimingtorevealthecausal mechanismof subgradesetlement.Atthesametime,thestudyelaboratedontheconstruction technologyandkeyoperatingpointsofthedynamiccompactionmethod,includingthepreparationworkbeforeconstruction, requiredequipment,materialselectionandconstructionprocessThroughsetlementobservation,foundationbearingcapacity testing,andstabiltyevaluation,thisstudycomprehensivelyevaluatedandcomparedthetreatmentefectsofdynamiccompaction. Researchresultsshowthatdynamic compaction cansignificantlyimprove subgrade setlement,enhancefoundationbearing capacityandoptimizeoverallstabiltyThisstudyprovidesvaluablepracticalguidanceforthetreatmentofhighwaysubgrade settlement under other similar geological conditions.

Keywords: sugrade subsidence; dynamic compaction method; foundation bearing capacity; loess area; expressway

黄土地区高速公路建设遭遇了特有的地质难题,其中路基沉降问题尤为显著。(剩余6621字)

目录
monitor
客服机器人