黄河冲洪积地区地下水对工程施工影响及处理措施研究

  • 打印
  • 收藏
收藏成功


打开文本图片集

中图分类号:TU4 文献标志码:A 文章编号:2095-2945(2025)19-0078-04

Abstract:TheconstructionsiteoftheSpringRiverBright MoonCommunityislocatedintheYellowRiveraluvial plainin Dezhou City,wherethegroundwaterlevelduringthefloodseasonisapproximately3.5metersdeep,withthemaximumexcavation depthofthepitreaching5.1meters.Thistudyinvolvesaninvestigationofthehydrogeologicalcondtionsoftheproposedsiteand theanalysisandresolutionofemergentissuesduringconstruction.Itsummarizes theimpactfactorsoftheYelowRiverallvial strataandtheslightlypressurizedgroundwaterontheproject,andproposescorrspondingcontrolmeasuresbasedonactual problemsencounteredduringconstruction.Theresearchthoroughlyanalyzesandadresesthecausesandpreventionofissuessuch asdisturbancestohefoundationbearingstratauetoexcesivelyhighwatercontentinthesubsoilgroundsubsidencecausedby dewatering,upliftofundergroundstructures,andtheriskofsuddeninrushesfromslightlypresurizedwaterundersuchgeological andhydrological conditions.This study aims to provide analogies for similar construction sites.

Keywords: complex geology;groundwater; outburst; rubber clay; treatment measures

岩土勘察工作中,技术人员在进行水文地质分析时,经常仅在水位标高、渗透系数及腐蚀性等方面考虑地下水对拟建建筑的影响,而往往忽视复杂地质条件叠加作用下,地下水对基础施工、基坑开挖带来的地质风险。(剩余4629字)

目录
monitor