地铁车站斜井爆破开挖对侧穿建筑物稳定性的影响分析

打开文本图片集
中图分类号:U455.6 文献标志码:A 文章编号:2095-2945(2025)19-0056-04
Abstract:During theblastingandexcavationofsubwaytunnels,adjacentbuildingswillbefrequentlydisturbedbyblasting vibrationwaves.Whenthisdisturbanceexcedsacertainthreshold,thebuildingwillbedamaged.Basedontheblasting excavationoftheinclinedshaftatZhenjiangRoad StationofQingdaoMetroLine5,andbasedonthenumericalanalysismethod ofthefiniteelementsoftwareLS-DYA,theblastingexcavationprocessoftheinclinedshaftcyclefotageissimulatedandthe impactofblastingexcavationonthestabilityofside-penetratingbuildingsisanalyzed.Theresultsshowthatthemaximum vibrationvelocityofbuildingpilesisgreaterthanthemaximumvibrationvelocityofplatesandcolumnsateverymoment,and themaximumvaluesofvibrationveloities ineachdirectionandcombinedvibrationvelocitiesarelowerthantherequirementsof thespecification;thevibrationvelocityintheexcavationdirectionismostobviouslyafectedbytheblastcenterdistaneandis thelargestamongthepeakvibrationvelocitiesineachdirection;the"voidffect"onlysignificantlyamplifiestheblasting vibrationvelocitywithinacertaindistanceafterexcavation;duringon-sitemonitoringatentionshouldbepaidtothepositionof thepiletopandplateedge.Theresearchresultscanprovidereferenceforfuturesafetyasesmentofbuildingsadjacentto subway tunnel blasting construction.
Keywords: vibration effects; LS-DYNA; inclined tunnel; cyclic footage;side-penetrating buildings
在进行地铁隧道的爆破施工时,由于炸药能量的瞬时释放,其所产生的巨大冲击力将穿透周边的岩石层,并对邻近的建筑物造成巨大的振动扰动,一旦这种扰动大于一定的阈值,就可能导致建筑的坍塌和损毁。(剩余3924字)