探究BIM在优化现代管网工程项目管理中的价值核心

打开文本图片集
中图分类号:TQ053.6;TP391.92 文献标志码:A文章编号:1001-5922(2025)07-0172-03
Abstract:Through case studies,the practical application and value of BIM in the engineering design,construction and operation optimization of pipe networks were revealed.The key role of non-sequential dynamic programming algorithm intheoptimization oflarge-scalepipenetwork system wasdescribed.The algorithm could eficientlydivide thecomplex large pipe network into specific smallstructures,ptimize independently,and integrate these results to obtain the optimal solution of the entire pipe network.BIM played a crucial role in this process,with its real-time dataintegration anddynamic simulation capabilities ensuringaccuracyand eficiency in theoptimizationof steadystate operations of the pipe network.Practical case studies further confirmed the practical value of BIM in modern pipe network project management.The succesful application of the combination of BIM and dynamic programming and dichotomy inthe steady-state operation optimization of pipe network marks that pipe network engineering project management has entered a new stage ofdevelopment.
Key Words:BIM;pipeline network;dynamic programming;bisection method;optimization现代城市的发展对管网工程的设计、施工及运 维提出了更高要求,传统管理方式依赖二维图纸和
手动数据处理,信息不对称常导致冲突、返工和成本增加[1-3]。(剩余3857字)