基于运行时模态分析和代理模型的大坝力学参数反演方法
张翰, 张 锋2, 谭尧升1, 姚孟迪2, 邓检华

打开文本图片集
Inversion Method of Dam Mechanical Parameters based on Operational Modal Analysis and Surrogate Model
中图分类号:TV39 文献标志码:A 文章编号:1005-8249(2025)01-0163-04
DOI:10.19860/j.cnki.issn1005-8249.2025.01.030
ZHANG Han1, ZHANG Feng2,TAN Yaosheng1,YAO Mengdi2,DENG Jianhua3 (1.China Three Gorges Corporation,Wuhan 430010, China; 2. China Three Gorges Construction Engineering Corporation, Chengdu 61OO95, China; 3.State Grid Electric Power Research Institute/ NARI Group Corporations, Nanjing 2111O0,China) Abstract:Itisofgreatsignificance toinvertdam mechanical parametersbasedon monitoring datafordamsafetyevaluation. Comparedwithstaticmonitoringdata,vibrationsignalcanbeterreflcttheoveralltructurecharacteristicoftedam.Itcanbe usedtoimprovethereliabilityofdammechanicalparameter inversionbyidentifyingdammodalparameters throughoperational modal analysis method.Intermsoftheissethatthefiniteelementanalysismodelneds tobecalledrepeatedyduring inversio,asurogatemodelofmappng materialparameters tomodal parameters isproposedbyusing neuralnetwork.inally, theoptimizationproblemofiversionissolvedbyusingadaptivegridsearchalgorithm.Theefectivenessof theproposedmethod is verified by inverting the zonal elastic modulus of the numerical model of a concrete arch dam.
Key Words: parameter inversion;operational modal analysis;dam;surrogate model; health monitoring
0 引言
近几十年来,我国西南地区修建了一批高库大坝,日常运行管理中十分重要的任务,是确保这些工程结构的安全稳定。(剩余7698字)