退役湛江舰安置工程施工风险分析及化解措施

打开文本图片集
中图分类号:P751 文献标志码:A
Construction Risk Analysis and Mitigation Measures for the Decommissioned Zhanjiang Warship Placement Project
LI Zhan',WANG Yuhang²(1.GuangzriEgigotioago5Ca;gogbldlogodo4)
Abstract: The decommissioned Zhanjiang Warship placement project is the world's first offshore mooring project for an unpowered vessel in a coastal typhoon-prone area,designed to withstand Category 17 typhoons and achieve a 40-year service lifespan.This paper analyzes construction risks and proposes mitigation measures for key phases,including structuralreinforcement modifcations beneath thedeck,instalationofdeckequipment,fabrication and driving of anchor piles,ballast and anchor chain installation,towing the vessel through shallow and narrow chanels into the harborbasin,and final mooring operations.The findings oferreferences and insights forsimilar offshore mooring projects.
Key words: offshore mooring engineering; risk analysis; risk mitigation
1 引言
退役湛江舰安置工程是一项复杂的海洋工程项目,其设计需确保抗台风能力达到17级,使用寿命达到40年,这对工程的设计、施工以及后续维护提出了严苛的要求。(剩余4421字)