大容量交直流船舶电站试验工装配置方案研究

  • 打印
  • 收藏
收藏成功


打开文本图片集

中图分类号:U665.12 文献标志码:A

Research on the Configuration Scheme of Testing Equipment forHigh-CapacityAC/DC ShipboardPower Stations

YANG Yanan(Hudong-Zhonghua Shipbuilding(Group) Co.,Ltd.,Shanghai20o129,China)

Abstract: This paper addresses the issue that domestic shipyards lack experience in the configuration of mooring test equipment for AC/DC power stations with relevant capacity levels, especially regarding the first applicationoflarge-capacity medium-voltage DC integrated power systems on vessels.Based on thedemand analysis for the mooring test of a ship's large-capacityAC/DC power station,a comprehensive configurationscheme for the power station's test load,cables,andcable trays is proposed.This solution resolves the chalengesof providing the necessary test conditions for high-capacityAC/DC shipboard power stations and offers areference for the application of similar systems on other vessels.

Key words: high-capacity AC/DC power station; testing equipment; configuration scheme

1 引言

随着我国综合电力系统在船舶领域的快速发展,第二代综合电力系统—中压直流综合电力系统由研发阶段开始进入实船应用阶段。(剩余4501字)

monitor