大型小水线面双体船襟翼舵连接套筒安装过程控制

  • 打印
  • 收藏
收藏成功


打开文本图片集

中图分类号:U663.31 文献标志码:A

Large SWATH Flap Rudder Connecting Sleeve Installation Process Control

ZHENG Naijian, FANLei, CHEN Zhiyuan,LIU Xin, LIU Kai(CSSC Huangpu Wenchong Shipbuilding Co.,LTD.,Guangzhou 510715,China)

Abstract: The flap rudder connecting sleeve assembly for a new large Small Waterplane Area Twin Hull (SWATH) vessel is supplied in its final state,requiring no post-instalation machining on the berth.This imposes higher demands on precision control during instalation.This paper detailscontrol measures for the installtion process of the connecting sleeve. Appropriate welding techniques are adopted to mitigate thermal deformation, and real-time monitoring of deviations between the inner bore center and the theoretical rudder system center is conducted during welding.This enables timely adjustments to the welding sequence,ensuring installation accuracy. Through rigorous analysis and practical application, these measures provide valuable insights for the construction of similar vessels in the future.

Key words: SWATH; flap rudder; connecting sleeve; process control

1 引言

近年来,建造了大量的港作拖轮、海洋工程船舶、补给船、推轮等特种用途船舶,这些船舶均具有较好的机动能力及低速甚至零速工况下的良好操纵性等要求。(剩余4134字)

monitor