某高烈度设防地区粉矿仓的结构隔震设计

  • 打印
  • 收藏
收藏成功


打开文本图片集

中图分类号:TU223 文献标志码:B 文章编号:1004-4345(2025)04-0047-05

AbstractToaddressthechalenges indesigningfineorebinstructuresonslopingsitesinhigh-intensityseismicregions, seismicisolationtechnologywasstudiedtoimprovetheirseismicprformance.Takingafinorebinprojectonaslopeinan8-degree seismiczoneasanexample,aseismcisolationlayerwasimplementedusinglead-rubberbearings,andboth isolatedandnonisolated structuralmodelswereestablishedfortime-historyanalysis.Theresultsshowthatafterestablishingtheisolationsystem,the fundamentalperidofthestructurewas extendedfromO.169sto2.09s,significantlyexceedingthesitecharactersticperiod(0.25s), greatly reducing seismic effects.The consumption of reinforced concrete was reduced by approximately 23% ,and the lower frame structurefacilitedmetingprocessequirementsforopeningsVerficationoftheisolationlayer(includingecentricity,wind resistance,andminimumseismicforce)aswellasstressaddisplacementof thebearingsallmetcoderequirements.Teonclusion indicatesthatseismicisolationdesignefectivelyenhancestheseismicperformanceoffineorebinsinhighintensityregins,saves materials,and optimizes structural layout.

Keywordsigtensityseismicfortificationregion;feorebin;seismicsolationdesign;leadrubberbarings;tructuralaalyis

粉矿仓是矿山选矿工艺中的关键设施,其通常采用圆筒仓型结构,具有筒体直径大、高度高、仓储容积大的特点。(剩余5272字)

monitor
客服机器人