基于粒子群算法高地应力软岩隧道支护方案优化

打开文本图片集
中图分类号:U455 文献标志码:A 文章编号:1005-8249(2025)04-0105-06
DOI:10.19860/j.cnki.issn1005-8249.2025.04.020
YU Wenjing1,²,GAO Xinqiang1,23, KONG Chao4,WANG Lichuan5, ZHAO Jingbo ° GUAN Yuezhuoer1²,DONG Beiyi1,²,ZHU Zhengguo1,2
(1. State Key Laboratory of Mechanical Behavior and System Safety of Trafic Engineering Structures,
Shijiazhuang Tiedao University, Shijiazhuang O5O043,China;2.Schol of Civil Engineering,Shijiazhuang
Tiedao University,Shijiazhuang O5O043,China; 3. Hebei Key Laboratory of Mechanics Behavior Evolution
and Control of Transport Engineering Structures, Shijiazhuang O50043, China; 4. School of Civil Engineering and Architecture, Southwest University of Science and Technology,Mianyang 21OoOO,China;
5. China Railway 18th Bureau Group Co.,Ltd., Tianjin 300222,China)
Abstract:Theinitial support parameters haveasignificant impactonthesafeconstructionof highlystressdsoftrock tunels withlargedeformations.Basedonahighlystressdtunnel inthewesternregion,numerical simulationandparticle swarm optimization(PSO)tooptimize keyparametersof theinitial support scheme,suchas:steelarchlongitudinalspacing,anchor bolt lengthand circumferentialspacing,andshotcretethicknessandstrength.Theresultsshowthattocontrolthesttlement deformationoftheinitialsupportachvault,thereisaninversecoelationbetweenthebendingstfessofsteelframeandthe
longitudialspacingofthesteelarch,aswellasthelengthandlongitudinal spacingoftheanchor.Theseparametersshouldbe selected within certainranges;Comprehensivearch fotand vault deformation analysis,anchor length should belonger than 3m , anchor longitudinal spacing should be less than 1.0m ;the strength grade and thickness of shotcrete are conservative and can be appropriately reduced.
Keywords:railwaytunnel;high ground stress;initial support deformation;optimization of supporting scheme;particle swarm optimization algorithm
0 引言
高地应力软岩隧道大变形控制是目前隧道工程的热点问题之一[1],具有施工风险大,整治成本高、处理周期长等工程特点。(剩余5484字)