上跨既有地铁盾构区间地铁工程结构变形控制技术

  • 打印
  • 收藏
收藏成功


打开文本图片集

中图分类号:U458.1 文献标志码:A 文章编号:1005-8249(2025)04-0090-05

DOI:10.19860/j.cnki.issn1005-8249.2025.04.017

WANG Ruiqiang,GUO Binbin,LIANG Tao,HE Yi,FAN Xiaoye

The Third Construction Co.,Ltd of China Construction Eighth Engineering Division,Nanjing 2100,China

Abstract:Takinganewlyconstructedsubwayas theresearchobject,thisstudyinvestigatesthedeformationcontroltechnologyof the subwayenginering structurethat spansoverthe existing subwayshieldtunnel section.Optimize the synchronous grouting presure and grouting volumeintheshield tunneling constructionparametersofthetestsection,designasecondarygrouting constructionmethod tocompletethedeformationcontrolofthesubwayengineringstructureintheshieldtunnelingsectiontest section;Basedonthemonitoringresults,adjusttheparametersof shieldtunelingconstruction,design polyurethaneisolation rings,adcompletethedeformationcontrolofthesubwayenginering structureintheshieldtunnelingsection.Theresultssowed that the maximum deformation of the arch crown was 1.2 and 0.8mm in the experimental section and the crossing section, respectively.Inthecrosingsection,themaximumdeformationof theupwardanddownward tracksofthetrackstructurereaied stable at 1.5 and1.47 mm,respectively.This technology effctively controlled the deformation of the shield tunneling section subway engineering structure.

Key words:crossngabove existing subway;shieldzone;subwayengineering;structural deformation;controltechnology; synchronous grouting

0 引言

随着城市的发展,地铁已成为人们出行不可或缺的交通工具之一[1]。(剩余4868字)

monitor
客服机器人