软土地区自动伺服系统深基坑变形分析

打开文本图片集
中图分类号:TU43 文献标志码:A 文章编号:1005-8249(2025)03-0084-06
DOI:10.19860/j.cnki.issn1005-8249.2025.03.016
Abstract:Indeepfoundation pitengineering insoftsoilareas,thehighcompresibility,lowpermeabilityandenvironmental sensitivityofthestrataposehigherrequirementsforsupporttechnology.TakingaShanghaistoragetankprojectasthe background,for an excavation depth reaching 16.6m (locall18.1m),the support systemadoptsan automaticservo steel support system.Monitoringdata isusedtotrackthelateral displacementofdiaphragm wals,thedynamicchangesofthesuport axialforce,thesurroundinggroundsurfacesetlementandtheresponsecharacteristicsofthewaterandsoiloutsidethepitare systematicaly tracked.Combined withthereal-time feedback and dynamicadjustment mechanism oftheservosystem,its activecontroldeformationabilityisverified.Theresearch foundthattheservosystem,throughthepressurethresholdseing andthecoordinationofmulti-levelsupports,significantlyreducedthemaximumlateraldisplacementoftheunderground continuous wall to 0.1%H ( H is the excavation depth),which is 31.3% lower than the average value of the traditional measurednorms.Theoreticalanalysisshows thattheself-adaptiveregulationofthesystemefectivelybalances thecontradiction between therheological efectof softsoilandthestressreleaseof excavationunloading,andits"prediction-responsecompensation" closed -loop logic provides a new idea for complex stratum foundation pit engineering.
Key words:automatic servo system;deep excavation;deformation control
0 引言
对于深基坑而言,超深基坑往往伴随着更大的变形和更广的影响范围[1]。(剩余5864字)