高速铁路非标简支箱梁预制架设施工技术


打开文本图片集

摘  要:高速铁路桥梁工程为了适应不同地形的立体交叉条件,在桥跨布置时不可避免的采用了部分非标简支桥梁。国内外常规施工方法,非标简支桥梁采用原位现浇法进行施工。原位现浇施工质量不易控制、安全风险高、施工成本高;而参照标准桥跨制采用制梁场预制,架桥机架设,则可优质、安全的完成施工任务。

关键词:高速铁路;非标简支箱梁;预制架设

中图分类号:U238        文献标志码:A         文章编号:2095-2945(2021)04-0165-05

Abstract: In order to adapt to the three-dimensional crossing conditions of different topography, some non-standard simply supported bridges are inevitably used in the bridge span layout of high-speed railway bridge engineering. According to the conventional construction methods at home and abroad, the non-standard simply supported bridge is constructed by in-situ cast-in-place method. The quality of in-situ cast-in-place construction is not easy to control, the safety risk is high, and the construction cost is high; while with reference to the standard bridge span system, prefabrication of beam yard and erection of bridge erection machine can complete the construction task with high quality and safety.

Keywords: high-speed railway; non-standard simply supported box girder; prefabricated erection

前言

近年来,我国高速铁路发展迅速,已成为世界上运营高速铁路最多的国家。(剩余3601字)