水利水电工程施工土石方调配方法及其应用

  • 打印
  • 收藏
收藏成功


打开文本图片集

摘  要:水利水电工程建设中涉及到大量土建工程,如何完成土石方调配和现场施工秩序息息相关。为顺利地完成水利水电工程的建设,该文针对土石方调配技术特点、原则和方法展开探讨,并且提出土石方调配技术应用及优化建议,以期为水利水电工程建设人员提供参考。

关键词:水利水电工程;土石方;调配方法;技术特点;应用要点

中图分类号:TV541      文献标志码:A          文章编号:2095-2945(2023)05-0177-04

Abstract: A large number of civil works are involved in the construction of water conservancy and hydropower projects, and how to complete the earthwork allocation is closely related to the on-site construction order. In order to successfully complete the construction of water conservancy and hydropower projects, this paper discusses the technical characteristics, principles and methods of earthwork allocation, and puts forward suggestions for the application and optimization of earthwork allocation technology, which provides reference for the construction personnel of water conservancy and hydropower projects.

Keywords: water conservancy and hydropower engineering; earthwork; allocation method; technical characteristic; application key points

土石方工程是水利水电工程建设的重要环节,有较大的工程量和施工难度。(剩余6154字)