摘  要:传统的综采工作面大跨度切眼施工期间,通常采用单体支柱配合π型钢梁加固顶板,顶板支护效果差,效率低下,且安全隐患较大。针对综采工作面切眼大跨度顶板支护难题,采用顺山液压支架加固顶板施工工艺,取得较好的支护效果。

关键词:大跨度切眼;顶板支护;顺山支架;施工工艺;支护效果

中图分类号:TD327      文献标志码:A          文章编号:2095-2945(2023)05-0116-04

Abstract: During the long-span cut-off construction of traditional fully mechanized mining face, single pillar combined with π-shaped steel beam is usually used to reinforce the roof, which leads to poor support effect, low efficiency and large safety risks. Aiming at the problem of large-span roof support in fully mechanized mining face, this paper adopts the construction technology of hydraulic support to strengthen the roof, and a good supporting effect has been obtained.

Keywords: large-span cut; roof support; hydraulic support; construction technology; support effect

传统的综采工作面切眼施工是在导硐切眼形成的前提下,沿导硐切眼方向对导硐切眼进行刷扩作业,通过增大切眼跨度以满足综采液压支架安装的空间需要。(剩余4962字)