大型会展中心“一模到底”BIM总控管理模式

打开文本图片集
中图分类号:TU17;TU71 文献标志码:A 文章编号: 1000-5013(2025)06-0646-08
Abstract:To systematically solve the technical bottlenecks in the construction of large-scale convention and exhibition centers,such as low efficiencyamong multi-stakeholder collaboration,dificulties in seamless data transfer,difficulties in complex structural construction control,and high requirements of lightweightoperation and maintenance,Xiamen International Convention and Exhibition Center is taken as the research object,and the“one-model-to-the-end”building information model(BIM) master control management mode is proposed. Taking BIM throughout the fullfe cycle of construction as thecore,thecollaborative management and control system ensure the continuity of the model and the seamless data transfer by standardized management mechanism and technological innovation. The results show that“one-model-to-the-end” BIM master control management mode can systematically open up the digital chain across the fullife cycle of large-scale public buildings, and provide the industry with a replicable BIM implementation paradigm.
Keywords:building information model; master control management mode; fullife cycle management;“onemodel-to-the-end";collaborative mechanism
大型会展中心作为城市重要公共建筑,由于其规模庞大、结构复杂及多标段协同需求,面临着施工精度控制难、全生命周期数据贯通难、多参与方协同低效等系统性挑战[1]。(剩余8249字)