岩溶地区顶管穿越的施工设计和应用

  • 打印
  • 收藏
收藏成功


打开文本图片集

DOI:10.3969/j.issn.1001-2206.2025.03.005

Construction design and application of pipe jacking crossing in karst areas

PANYueyu,XUXu Sinopec Petroleum Engineering Co.,Ltd.,Dongying 257O26,China

Abstract:Noexcavationcrossngofpiesintearstlandfomisecogedsatecnicalchallengeintheindustry.Insposeto this isue,basedoapipejcinrossgproetiarsaraRouteTwasselecdsthiecrossnglocatonnding shaftoftepiejackingtunnelwassetontheastsideoftherivertroughinvestigation,suveyandanalysisofengineeinggeology, hydrogeologydveegeoloicaldio.Gvntactestiddilifteproct,ulanceocaing pipejacking processthatmatchesthepipejackingrequirementsoftheprojectwasdesigned.Throughcalculationandverification,the totaljackingforcerequiredforjacking wasdeterminedtobe5OookN.Sixmajortypesofriskstatmaybeencounteredduringpipe jackinginkarsteaseresummarzd,ndoespondingpreventiveandntrolmasueswerefouatedEventallhepipe jacking projectintearstaeawassuccessullycompletedinoneatempt,demonstratingreliableesign,reasonableosuction plans,and effective risk prevention and control measures.

Keywords:karst landform; karst; pipe jacking design

油气管道在穿越山川湖泊时,可选用顶管、开挖、定向钻、盾构等穿越方式。(剩余5448字)

monitor