系梁施工对既有盾构隧道影响的数值模拟

  • 打印
  • 收藏
收藏成功


打开文本图片集

【中图分类号】:U455 【文献标志码】:A 【文章编号】:1008-3197(2025)03-14-03

【DOI编码】:10.3969/j.issn.1008-3197.2025.03.004

Numerical Simulation of the Influence of Tie Beam Construction on Existing Shield Tunnel

CHEN Yaqi

(CCCC Second Highway Consultants Co.Ltd.,Wuhan 430056,China)

【Abstract】:Inorder tostudytheimpactofconstructionloadsonexistingshieldtunneld,thisstudytakestheconstruction of the tie beamattherailway-related pilelocation in ContractSectionA1of thefirstphase projectof Fuzhou Binhai New City Expressway as acase.The finite element software midas GTS NX was employed for numerical simulation,aiming to analyze the additional stress imposed on the shalow-buried existing shield tunnel and the consequent lining displacement during the tie beam construction process.Based on the simulation results, anassessment was made todetermine whether the tie beam construction scheme complies with relevant specifications,thereby ensuring the safe operation of the existing tunnel.

【Keywords】:tie beam;constructionload;shield tunnel

随着城市基础设施建设推进,新建构筑物不可避免与既有结构产生交叉,新建工程施工对既有建筑影响的评估对于既有构筑物安全运营至关重要。(剩余2221字)

monitor