摘 要:以徐民路东向阳河桥为例,基于中国国际进口博览会,介绍设计方案在特定条件下的调整和优化,分析钢箱梁吊装工况,阐述吊装施工过程,成功保障进博会城建配套项目的建设任务,综合效果较好。
关键词:进博会;东向阳河桥;建设实践;钢箱梁;工程设计
中图分类号:U445.4 文献标志码:A 文章编号:2095-2945(2025)06-0146-04
Abstract: Taking the Dongxiangyang River Bridge on Xumin Road as an example, based on the China International Import Expo, the adjustment and optimization of the design plan under specific conditions are introduced, the hoisting conditions of the steel box girder are analyzed, and the hoisting construction process is elaborated. The construction tasks of urban construction supporting projects of the CIIE are successfully guaranteed, with good comprehensive results.
Keywords: CIIE; Dongxiangyang River Bridge; construction practice; steel box girder; engineering design
城乡规划坚持“先规划后建设”原则,城建配套基础设施项目具有严格的审批流程和建设程序[1-2]。(剩余5208字)