摘  要:深厚覆盖层的防渗措施直接影响到闸坝能否正常蓄水以及闸基的渗透稳定性。文章采用有限元分析和理论计算方法,对拉拉山水电站的闸基深厚覆盖层开展渗流稳定和闸坝沉陷分析,并提出相应的防渗处理措施,研究成果对类似工程具有参考价值。

关键词:闸坝;深厚覆盖层;渗流;地基处理

中图分类号:TV223.6     文献标志码:A          文章编号:2095-2945(2022)20-0118-04

Abstract: The impervious measures of deep overburden directly affect the normal water storage of Sluice dam and the seepage stability of gate foundation. In this paper, the seepage stability and dam settlement of deep overburden of gate foundation of LalaShan hydropower station are analyzed by finite element analysis and theoretical calculation method, and the corresponding anti-seepage treatment measures are put forward, the research results have reference value for similar projects.

Keywords: sluice dam; deep overburden; seepage; foundation treatment

深厚覆盖层具有透水性强、抗冲能力差的特点,极易发生渗透变形或渗透破坏,直接影响到上部建筑物的安全。(剩余1994字)