基于动态剪枝穷举法的LID设施优化研究

  • 打印
  • 收藏
收藏成功


打开文本图片集

关键词:低影响开发;径流控制;SWMM模型;LISFLOOD-FP模型;海绵城市;穷举法

中图分类号:TV124;P338 文献标志码:A

doi:10.3969/j.issn.1000-1379.2026.01.016

Research on LID Facility Optimization Based on Dynamic Pruning Exhaustive Method

LIU Ankang1,XU Qing',ZHU Wenjin¹, ZHANG Yang1, XIE Baozhu², TANG Xinyue¹,KUANG Lijie' (1.School of Civil and Ocean Engineering, Jiangsu Ocean University,Lianyungang 222Oo5,China; 2.School of Art and Design, Jiangsu Ocean University,Lianyungang 2220O5,China) Abstract:LowImpactevelopent((LI)facitis,ssustaiablestoatermanagnteasure,emoratesfcantecties inmitgatingubniundatio,educingpeaknoffndimprovingateralityHowever,sietificalltiingteyoutdalef LIDfacilitiestoachevebothrunoffreductionandeconomicfeasibilityemainsachalengngtask.TissudyfcusedontheHzouDistrict ofLianyungangCityaguProvicgatingtaacteistsofbnfuntioalons,tropdidiectioaldaicing basedglobaleaustiesearchetod,whichmploysdiferentiatedunofcontrolatestesurethepreciseatingofDfacilitytyps andscales.Acros-scalecouplingodelforsurfacerunoffandsufaceinundationwasestablishedbyitegratingtheSWMhydrological modelwiththeLISFOOD-FPdrodamicodel.Thesultsindicatedthatundera-yareturnperiod,thunoffcontolateieasd from 31.9% to 64.1% ,the peak runoff decreased by 63.5% ,the total inundation volume was reduced by 89 % ,the inundated area was reduced by 73.6% ,and deep inundation zones (with depths greater than 0.5m )were virtually eliminated. The bidirectional dynamic pruning exhaustivemetoddrheterogeesortsilylanedsatialadaptablitydgobloncsibityedicp ing strategy,by eliminating ineffective LID combinations,reduced the computational load by 58.7% ,demonstrating the practicality of this algorithm for low-dimensional nonlinear optimization problems.

Key words:low lmpact development;runoffcontrol; SWMMmodel;LISFLOOD-FP model;sponge city;exhaustive method

低影响开发(LID)设施作为雨洪管理的核心手段,广泛应用于城市内涝缓解、径流峰值削减和水质改善[1-2]。(剩余10287字)

monitor
客服机器人