机理-数据融合的造斜率智能预测方法

打开文本图片集
中图分类号:TE243文献标识码:ADOI:10.12473/CPM.202404089
Bai Jiashuai,Zhong Yinming,Wang Liwei,etal.Mechanism-data fused intelligent prediction of build-up rate[J].China Petroleum Machinery,2025,53(5):1-9.
Mechanism-Data Fused Intelligent Prediction of Build-Up Rate
Bai Jiashuai1Zhong Yinming1Wang LiweiLi Zhen²Song Xianzhi²Liu Zihao²Zhu Zhaopeng³ (1.OiProductionTechnology ResearchInstitute(Supervision Company),PetroChina XinjiangOileldompany;2.Collgeof PetroleumEngineering,China UniversityofPetroleu(Beijing);3.ColegeofMechanicalandTransportationEngineering,Chna U niversity of Petroleum (Beijing))
Abstract:The accurate prediction ofbuild-up rate is fundamental for wellbore trajectory control,and it directlyaffects thedrilling effciencyof directional wells.However,due to the complexityof downhole mechanical behaviors,traditional prediction methods cannot accurately predictthe build-uprate for their limitations.This paper presents a mechanical-intellgent model fused build-up rate prediction method.Specifically,the mechanical model isused tocalculate the bit side force,bit rotation angleand ultimate build-uprate as the main control factors,and the automated machine learning framework is combined with other parameters for purpose of fiting prediction,therebyavoiding theempirical coeficient inversion intraditional method.In this way,theadvantagesof accurate macroscopic pattern description of the mechanical model and strong nonlinear fiting abilityof the inteligent modelare fully exerted.The data from 14 wels inthe Mahu block of Xinjiang Oilfield were used for training and test.The results show that,with mechanical parameters fused,the model achieves the maximum error,root mean square error and average absolute error of build-up rate reduced by 17% , 12% and 8% ,respectively,with the root mean square error and average absolute error less than 1.00∘ per 30m ,indicating that this method can effectively improve theaccuracyof build-uprate prediction,and is more effectively performed especially in hole sections with sharp changes in build-up rate.This study provides a new idea for the acurate prediction of build-up rate, and also a technical support for the precise control of wellbore trajectory.
Keywords:intellgent driling;automated machine learning;build-up rate prediction;mechanism-data fused; mechanical parameter
0引言
造斜率的精确预测是实现井眼轨迹高质量调控的基础,但由于造斜率的影响因素极为复杂,至今尚未完全厘清底部钻具组合(BHA)在复杂地层中的造斜机理,所以精确预测仍具挑战性。(剩余13253字)