AbstractToaddressthechallengesofconstructing large-section lowerorebins inweak rock strata-characterized byhigh technical difficulty and stringent safety requirements,an integrated construction scheme of“raise boring + drilling-blasting downward excavation/enlargement + layered concreting"was proposed and applied based on practical experience from a metal mine's crushing systemproject.Thesolutioninvolves threekeyphases:first,aguideraisewasdriledusingaraiseboring machnetoconnectwiththe lowerlevel,singasblasfreuaceanduckmoalael;sondlytopodowardargemeniadrilising withstrctlyoptizedblastparametestozeuroudngckdistubance;fiallsteelforcedocetelingisled throughsegmentwisesupportcasting.Tepracticeesultsdemonstratethatthisapproachnsuredonstructionsafetythroughpaalel operations (upper/lowerorebins)viaplanedmuckroutesadsafetyisolationmeasures,significantlyincreasedconstructiociency reducedconstruction time by15days for thelowerore bin,and acceleratedoverallcrushingsystem completion by43 days.
Keywordscrushingsystem;lowerorebin;raiseboring method;driling-blasting method;layeredcasting;weakrock strata; construction safety
溜破系统是地下矿山基建期关键工程,直接关系着整个矿山生产系统的形成I。(剩余4881字)