摘  要:在我国不断推进城市化建设进程的形势下,市政工程施工中顶管沉井施工方法的应用频率越来越高。该文重点结合厦大片区排水改善西大沟改造工程的实际情况,对市政工程顶管沉井施工方法及注意事项进行阐述和分析,希望可以为市政工程顶管沉井施工质量的提高打好基础。

关键词:市政工程;顶管沉井;施工方法;施工质量;施工程序

中图分类号:TU990.3      文献标志码:A          文章编号:2095-2945(2023)35-0149-04

Abstract: In the situation of continuously promoting the process of urbanization construction in China, the application frequency of pipe jacking and caisson construction method in municipal engineering construction is also getting higher and higher. According to the actual situation of Xidagou reconstruction project of drainage improvement in Xiamen area, this paper expounds and analyzes the construction methods and matters needing attention of pipe-jacking caisson in municipal engineering, hoping to lay a good foundation for the improvement of construction quality of pipe-jacking caisson in municipal engineering.

Keywords: municipal engineering; pipe jacking caisson; construction method; construction quality; construction procedure

在我国社会经济发展速度不断加快的形势下,市政工程的施工数量越来越多,施工规模越来越大。(剩余5879字)