2 200 t起重船机舱风机选型计算

  • 打印
  • 收藏
收藏成功


打开文本图片集

摘    要:本文基于我司设计建造的2200t起重船实例,通过计算机舱设备燃烧及散热所需空气量,分析整个机舱所需空气量;同时根据机舱风管布置,考虑最远支管送风情况,分析末端的送风压力损失和烟囱排风损失,计算风机的压力损失,从而选型出机舱风机所需风量和静压。

关键词:风机;换气次数;散热;燃烧;压力损失

中图分类号:U662.2                                  文献标识码:A

Calculation of Engine Room Fan Selection for 2 200 t Crane Ship

CAO Hui, DU Heng, ZHOU Chengxiu

( China Merchants Heavy Industry (Shenzhen) Co., Ltd., Shenzhen 518054 )

Abstract: Based on the 2 200 t crane ship designed and built in our company, the amount of air needed for the whole engine room is analyzed by calculating the amount of air needed for heat dissipation and combustion in the engine room. At the same time, according to the engine room air duct layout, considering the farthest branch pipe air supply situation, the air supply pressure loss of the end and funnel exhaust loss are analyzed, the fan pressure loss is calculated, so as to select the engine room fan required air volume and static pressure.

Key words: Fan; Air change ratio; Heat dissipation; Combustion; Pressure loss

1     前言

我司建造的2 200 t非自航起重船,入级CCS。(剩余2374字)

目录
monitor