基于综合效能评估的电网设备更新决策研究

打开文本图片集
中图分类号:TM73 文献标志码:A 文章编号:2095-8188(2025)05-0068-08
DOI:10.16628/j. cnki.2095-8188.2025.05.010
Abstract:Aims to develop ascientificand rational decision-making method for power grid equipment renewal toachievethehealthyandsustainableoperationofpowergridenterprises.Basingonthetheoryoftotallifecyclecost (LCC),the Weibull model is introduced tocalculatecosts,andthe time valueof moneyis incorporatd toestablish an optimization model.Therebytheoptimal economic lifeand theminimum total lifecyclecostare derived.A comprehensive performance evaluationsystem isconstructed from theperspectivesof economy,technology,and safety.Itcovers six indicatorssuchas total lifecyclecostandavailability.Theindicatorsarequantifiedthroughthe Analytic Hierarchy Process (AHP)and normalization.Taking the communication lineequipment of Company A as an example,the number of the renewal equipment is reduced by 329km compared with the expected amount,and theequipment renewal budget is decreased by26.45%.Theresults show that the proposed model effectively reduces the operating costs of power grid enterprises and enhances the comprehensiveperformance of the equipment,providing strong support for the equipment renewal decisions.
Key words: power equipment; total life cycle cost;comprehensive performance;equipment renewaldecision
0 引言
随着中国经济的快速发展和社会环境的不断变化,各行各业在生产运营中对于电力资源的需求量也越来越大[1]。(剩余8976字)