高速铁路CRTSⅢ型板式无砟轨道建设期碳排放研究

打开文本图片集
中图分类号:[U2-9];X32 文献标志码:A
本文引用格式:,等.高速铁路CRTSI型板式无砟轨道建设期碳排放研究[J].华东交通大学学报,2025,42(2):66-75.
Carbon Emission Calculation for High-Speed Rail CRTSII TypeSlabBallastlessTrack
Yang Shusheng1²,Zhu Caiyiyi',Deng Ting',Wang Chendong²,He Qing1,Wang Ping' (1.School of Civil Engineering, Southwest Jiaotong University, Chengdu 610o31, China; 2.Jinan-Qingdao High Speed RailwayCo.,Ltd., Jinan250102, China)
Abstract: Inrecent years,ballastlesstrack systems in high-speed railways have developed rapidly,but studies on carbon emission characteristics and precise calculation methods during the construction phase remain limited. This paper conducts a comprehensive quantitative analysis of carbon emisions during the construction phase of CRTS I| slab ballastless track in high-speed railways.The PROMETHEE-IlI method is used to rank carbon emission factors,and a ballastlesstrack construction carbon emission database is built using MySQL.The proposed models quantify the per-kilometer carbon emissions of embankment,bridge,and tunnel sections. Concrete accounts for 41.06%~43.52% ,steel accounts for 52.90%~54.53% ,with materials contributing up to 96.00% of total emissions.Results show that embankment sections produce significantly higher carbon emisions than bridge and tunel sections. Concrete and steel are the dominant emission sources.Sensitivity analysis reveals that steel emission factors have the strongest impact on total emissions, followed by concrete.
Key words: high-speed railway; CRTS II type slabballastless track; construction phase carbon emissions; database; carbon emission calculation
Citationformat:YANG SS,ZHUCYY,DENGT,etal.Carbon emissioncalculation forhigh-speedrail CRTS III type slab ballstless track[J].Journal ofEast China Jiaotong University,2025,42(2): 66-75.
全球变暖已成为21世纪人类面临的主要环境问题之一,控制温室气体排放成为国际共识。(剩余13497字)