• 打印
  • 收藏
收藏成功
分享

高原地区框排架填充墙抹灰施工质量通病成因分析及防治

【摘要】随着高原水电工程的不断修建,由于高技能工人欠缺,地域昼夜温差大,气候干燥,日照强烈等环境气候影响,厂房框排架填充墙抹灰工程存在裂缝、空鼓、平整度差等问题。针对以上问题,对其产生的原因进行认真分析,研究防治措施,以完善高原地区框排架填充墙抹灰工程的施工质量,降低施工成本。

【关键词】高原;框排架;抹灰施工;质量通病;防治

【Abstract】With the continuous construction of Plateau hydropower project, due to the lack of skilled workers, large temperature difference between day and night, dry climate, strong sunshine and other environmental climate effects, there are some problems such as cracks, hollowing and poor flatness in frame-bent infill wall plastering engineering of factory buildings. In order to improve the construction quality and reduce the construction cost, the causes of these problems are analyzed and the prevention measures are studied.

【Key words】Plateau, frame bent, plastering engineering, common quality problems, prevention and cure

【DOI】10.12334/j.issn.1002-8536.2021.34.056

随着建筑节能技术的高速发展,越来越多的电站厂房采用了框、排架填充墙结构。(剩余3605字)

网站仅支持在线阅读(不支持PDF下载),如需保存文章,可以选择【打印】保存。

畅销排行榜
目录
monitor