• 打印
  • 收藏
收藏成功
分享

临夏至大河家高速公路营滩互通K7+900-K8+400段滑坡监测及稳定性分析


打开文本图片集

摘  要:临夏至大河家高速公路营滩互通K7+900-K8+400段,由于受雨季持续降雨影响,右侧山体发生滑坡,严重影响营滩互通的正常施工。滑坡受降雨影响显著,稳定性极差。文章介绍了该滑坡的监测方案,通过对监测数据的分析,得出降雨对该边坡稳定性有显著影响的结论。

关键词:滑坡;变形监测;数据分析

中图分类号:P642.22      文献标志码:A          文章编号:2095-2945(2021)29-0125-03

Abstract: In the K7+900-K8+400 section of the Yingtan Interchange of Linxia-Dahejia Expressway, due to the continuous rainfall in the rainy season, a landslide occurred on the right side of the mountain, which seriously affected the normal construction of the Yingtan Interchange. The landslide is significantly affected by rainfall, and its stability is extremely poor. This article introduces the monitoring plan of the landslide. Through the analysis of the monitoring data, it is concluded that rainfall has a significant effect on the stability of the slope.

Keywords: landslide; deformation monitoring; data analysis

山体滑坡是常见的地质灾害之一,山体滑坡不仅可以造成一定范围内的人员伤亡和财产损失[1],还会给附近的桥梁、建筑等工程设施造成严重的危害[2-3]。(剩余3945字)

网站仅支持在线阅读(不支持PDF下载),如需保存文章,可以选择【打印】保存。

目录
monitor