三筒吸力桩导管架建造工艺与精度控制

打开文本图片集
摘 要:海上风电场三筒吸力桩导管架,可分为过渡段、导管支架、吸力桩三大部分。本文探讨了这三部分和总组的建造工艺流程以及建造过程中的精度控制要点,为类似项目提供参考。
关键词:三筒吸力桩导管架;建造工艺;精度控制
中图分类号:TH162 文献标识码:A
Construction Technology and Precision Control
of Three-Cylinder (Suction Pile) Jacket
ZHANG Ling1, LI jin2
( 1. CMHI ( JS ) , Nantong 226116; 2.Jiangsu Shipping College, Nantong 226010 )
Abstract: Based on the fact that the three-cylinder (suction pile) jacket of offshore wind farm is divided into three major parts: ITD, Pipe support and suction pile. This paper discusses the construction process of these three parts and the erection work and the key points of progress control in the construction process. It can provide reference for subsequent similar projects.
Key words: Three Cylinder (Suction Pile) Jacket; Construction Technology; Precision Control
1 前言
海上风电是可再生能源开发的重要领域,是战略性新兴产业的重要组成部分。(剩余4487字)