深中通道钢壳沉管钢材物量管控研究

  • 打印
  • 收藏
收藏成功


打开文本图片集

摘要: 深圳至中山跨海通道沉管隧道是大型钢结构工程,该项目的钢材物量直接影响建造成本,物量管控是设计管理的重中之重。本文主要通过物量管控方法研究并应用于项目钢材物量管理中,以达到可持续并高质量的管理钢材,最大限度提高钢材利用率,降低钢材采购成本的目的。

关键词: 钢材;利用率;物量管控 ;成本

中图分类号:U614                 文献识别码:A

Steel Quantity Control of Steel Shell Immersed Tube of Shenzhen-Zhongshan Cross-River Channel

LIU Ya, GUO Wenzhong, PAN Junfa, HE Maohua

(CSSC Guangzhou Huangpu Wenchong Shipbuilding Co.,Ltd,Guangzhou 511462)

Abstract: Shenzhen-Zhongshan cross-river channel immersed tube tunnel is a large-scale steel structure project, the steel quantity of the project directly affects the construction cost of the project, and the steel quantity control is the top priority of the design management. This paper mainly studies the material quantity control method and applies it to steel quantity management of the project, in order to achieve sustainable and high-quality steel management, maximize the utilization rate of steel and reduce the steel procurement cost。(剩余3175字)

目录
monitor